Sample Page

    DAILY LABOR RECORD

    HOURS
    X Set
    X Job Walk X Pull Material X Set Up X Other
    X Travel
    X Shop to Job X Job to Job X Shop to Job/Round Trip
    X Drop
    X Pull New Cable X Drop Cable X Terminate Cable X Other

    X Equipment
    X Install Equipment
    X Terminate Riser
    X Terminate Voice
    X Other
    X Terminate Data
    X Fiber
    X Install Innerduct X Install Fiber X Terminate Fiber X OTDR/Fiber
    X Test
    X Test Voice
    X Troubleshoot
    X Test Data
    X Call Back (Fill out CBK Form)
    X Test Fiber X Test Riser

    X Other
    X Clean Up X Paperwork X Final Job Walk X Other
    TIME
    From:ToTotal
    From:To

    DAILY WRAP UP CHECKLIST FOR ALL TECHS: Photos of your work for the day taken? As-built photo taken by lead tech and emailed in?

    (Required)Materials UsedNo Materials Used
    (Required)Need to Return to Site - Job IncompleteNo Need to Return to Site - Job Completed and Photos of Work Taken
    Need to Return to Site - Job Incomplete - Phases/Areas Remaining or Punch List Items To Do
    Technicians on Job
    X Job Completed - No Need to Return - Final walkthrough for clean-up, quality control and customer/office checkout/sign-off done.
    Enter your email address here:
    © Copyright 2026 • PACIFICOM • All rights reserved. Designed by PacifiCom and Cuselleration